Free estimates from a family-owned electrical contractor. License EC13013906.

Call (727) 258-3346
Call Now
Get a Free Estimate
Free Estimate

Bluefin blog

Generator for Hurricane Season: A Step-by-Step Plan

Drawing of a Gulf coast beach at sunrise with a palm tree, dune grass and pelicans

Getting a generator for hurricane season in Parrish, FL is a project with a fixed order, and most of the time goes to things that aren’t the generator. First decide what has to stay on. Then confirm your fuel, natural gas or propane. Then have a licensed electrical contractor run a load calculation, size the unit and pick the transfer switch. After that come the permit, the pad, the gas and electrical work, the inspection and a test under load. Atlantic hurricane season runs June 1 to November 30, so the homeowners who are ready in June started in winter or spring. If a storm is already on the map, a standby system won’t be in place in time, and a safely connected portable is the realistic plan.

Before you start: what to have in hand

Fuel is the piece that sinks this project when it’s missing. A standby unit needs natural gas at the house or a propane tank big enough to carry it for days. If you don’t know which one you have, find out first. Everything else follows from it. Gather these before anyone visits:

  • A short list of what must run in an outage: AC, fridge, well pump, medical equipment, a home office.
  • A clear photo of your electrical panel with the door open, and one of the label inside.
  • A photo of your electric meter and, if you have one, your gas meter.
  • Your HOA rules on outdoor equipment, if you live in a deed-restricted community.
  • A rough idea of where the unit could sit, away from windows and doors.

With those five things, an estimate visit goes quickly and the numbers you get back are real.

Your hurricane season generator plan, step by step

Follow these in order. Skipping ahead is how projects stall.

  1. Write your must-run list (15 minutes). Decide between essentials only and the whole house, because that choice sets the size of everything after it.
  2. Confirm your fuel (one phone call, then days to weeks). Ask your gas utility or propane supplier what your service can deliver, since a meter upgrade or a new tank has its own wait.
  3. Book a site visit and load calculation (about an hour on site). A licensed contractor measures what your home draws, so the unit is sized on numbers and not on a guess.
  4. Choose the generator and transfer switch (a day or two to decide). The switch is what moves your home onto backup power safely, and it has to match your panel.
  5. File the permit (set by the county, often weeks in busy months). Electrical and gas work both need one in Florida, and nothing gets installed until it’s issued.
  6. Set the pad and place the unit (part of a day). It needs a level base at the right height and clearances, which the inspector will check.
  7. Run the gas and electrical connections (commonly one to a few days). This is where the fuel line, the switch and your panel get tied together.
  8. Pass inspection and utility sign-off (scheduled by the county and utility). The system isn’t finished until both have approved it.
  9. Test under load and set the weekly self-test (an hour). You want to see it carry the house once before you ever need it.

Steps three through nine are what our home generator installation service covers. If you’re stuck on step two, our comparison of a natural gas vs propane generator will help you choose.

Drawing of a standby generator on its pad beside a house, wired to a transfer switch on the wall

The step most people get wrong

It’s the calendar. People start when a storm gets a name. By then, permit offices are busy, suppliers are short on units, and every installer in Manatee County is booked. The work itself is quick. The waiting around it isn’t.

Here’s how to tell if you’ve made this mistake: hurricane season has started and you don’t have a permit filed. If that’s you, and it may be if you’re reading this in October, be honest about the goal. A standby system begun now protects you next June. For the weeks left this season, the workable plan is a portable generator connected through a properly installed inlet and interlock or manual transfer switch, never through a dryer outlet. Our guide to a manual vs automatic transfer switch explains the difference.

Is your panel full, or older than the house’s last renovation? See what our panel replacement and upgrades work involves before you size a generator around it.

How long each part takes, honestly

The on-site work is the short part. A site visit takes about an hour. Setting the unit and making the connections commonly takes one to a few days, depending on how far the generator sits from the panel and the gas source.

The long parts are out of your hands and ours. Permit review time is set by the county. A gas meter upgrade is scheduled by the utility. Equipment lead times move with demand, and demand jumps every time a storm enters the Gulf. That’s why two neighbors on the same street can have very different experiences. The one who called in February has a quiet, orderly project. The one who called in August is waiting on three other people’s calendars.

We won’t promise a finish date before we’ve seen your home and checked on the permit and fuel side. Anyone who does is guessing.

Drawing of a calendar with a weekday circled for a free estimate visit

When to hand it to a professional

Do the first two steps yourself. The list, the photos, the HOA check and the fuel call cost nothing and save time. Hand over everything that touches wiring or gas. In Florida this work requires a permit and a licensed contractor, and it’s also where the real danger is. A generator wired into a home without a transfer switch can send power back up the line toward utility crews.

Portable units have their own rule. The U.S. Consumer Product Safety Commission says to run them outside, at least 20 feet from the house, with the exhaust pointed away, because of carbon monoxide.

What a standby install costs depends on a few things: the size of the unit, the type of transfer switch, the distance to your panel and fuel, whether a gas line or tank has to be added, and whether the panel needs upgrading first. If yours does, our page on panel replacement in Bradenton shows what that job looks like nearby. We don’t post prices, because two homes on the same block can need very different work. A free estimate gives you the real figure.

How Bluefin Power Solutions runs a generator project

Bluefin Power Solutions is a Florida Certified Electrical Contractor, License EC13013906, based in Parrish and licensed and insured. We serve Manatee and Sarasota counties and the south Tampa Bay area, and we hold a 5.0 rating on Google.

A project with us starts with your must-run list and a load calculation, not a catalog. We tell you which size fits, which switch suits your panel, and what the fuel side needs. Then we handle the permit, the install and the inspection, and we run the system under load with you before we call it done. Small commercial properties, such as an office or a shop that can’t lose refrigeration, go through the same steps. Financing available through Synchrony.

We work in the neighborhoods around us every week. If you need an electrician in Lakewood Ranch, or you want to read about generator installation in Bradenton, those pages cover the local details.

A generator protects you from outages, not from the surge when power returns. Take a look at whole home surge protection while you’re planning.

Hurricane season generator FAQ

When should I buy a generator for hurricane season?

Start in winter or spring. Permits, fuel upgrades and equipment all take time, and waits get longer once the season opens on June 1.

What size generator do I need for a hurricane?

It depends on what you want to run. A load calculation by a licensed electrical contractor gives the real answer for your home.

How long does it take to install a whole house generator?

The on-site work commonly takes one to a few days. The permit, the fuel connection and equipment delivery add the most time, and they vary.

Can a generator run my air conditioner during a hurricane outage?

Yes, if the system is sized for it. Central AC is usually the biggest load in a Florida home, so it has to be in the calculation from the start.

Do I need a permit to install a generator in Florida?

Yes. A standby generator involves electrical and fuel work, and both are permitted and inspected.

Is a portable generator enough for hurricane season?

It can cover the basics, such as a fridge, lights and a few outlets. It needs refueling, safe placement outdoors and a proper connection to the house.

How long can a standby generator run during an outage?

On natural gas it runs as long as the gas supply holds. On propane it runs until the tank is empty, so tank size matters.

Start your plan now

Whether you’re getting ready for next June or need a safe setup for the rest of this season, the first step is the same. Request a free estimate from Bluefin Power Solutions, send us your must-run list and panel photos, and we’ll tell you what your home needs.

Have a question about your own home? We give free estimates and answer the phone Monday to Friday, 8 AM to 6 PM.

Get a Free Estimate

Prefer to talk?
(727) 258-3346

Tell us what you need. We call back Monday to Friday, 8 AM to 6 PM.

Menu